Create a consolidated RFI Log for design‐clash red-lines from 3D BIM coordination meeting including extracted Revit element GUIDs, assigned design consultant routing, and contractual NTP+ days impact tracking

Generate create a consolidated rfi log for design‐clash red-lines from 3d bim coordination meeting including extracted revit element guids, assigned design consultant routing, and contractual ntp+ days impact tracking for Architectural, Engineering, and Related Services industry

Architectural, Engineering, and Related Services

Agent Configuration

Login required: You need to sign in to execute this agent.

Click to upload or drag and drop

Allowed: PDF, XLSX, NWD, RVT

Max size: 50MB

Upload consolidated meeting minutes or clash-detection report from Navisworks, Revit, or BIM 360 (PDF, XLSX, NWD)

Click to upload or drag and drop

Allowed: RVT, IFC, XML

Max size: 200MB

Revit model (RVT) or IFC/COBie file containing the GUIDs and element parameters for red-lined items
Categorize the priority level for action required under AIA/ConsensusDocs BIM specifications
Design consultant discipline that must resolve red-line item, derived from A/E standard of care matrix
Input anticipated schedule impact measured from current Notice-to-Proceed date (+/- whole days)
Paste comma-separated GUID strings from Revit, BIM 360, or IFC file (up to 500 characters)
Consecutive RFI number aligned with project log and cross-reference to 2D drawing sheet or detail
Write the concise question or clarification required—one sentence question, two-sentence problem description—aligned with CSI Section & latest IFC model date
Select the statutory response format per jurisdictional requirements and contract deliverables matrix
Current delivery phase influences reviewer authority and sponsor approval threshold