Create a load-flow annotated single-line diagram for a manufacturing retrofit project showing real-time kW, kVAR, and voltage-drop calculations across emergency generator paralleling gear during simultaneous elevator motor startup sequences

Generate create a load-flow annotated single-line diagram for a manufacturing retrofit project showing real-time kw, kvar, and voltage-drop calculations across emergency generator paralleling gear during simultaneous elevator motor startup sequences for Architectural, Engineering, and Related Services industry

Architectural, Engineering, and Related Services

Agent Configuration

Login required: You need to sign in to execute this agent.

Click to upload or drag and drop

Allowed: PDF, DWG, DXF, VSD

Max size: 50MB

Upload existing facility electrical single-line diagram including existing generator paralleling switchgear, distribution panels, elevator motor control centers, and protective device settings
Enter generator ratings, fuel type, kW capacity, kVAR capability, transient reactance (Xd'), and subtransient reactance (Xd'') for calculating voltage dip during motor starting

Click to upload or drag and drop

Allowed: JPG, PNG, PDF

Max size: 10MB

Upload elevator motor nameplate data showing horsepower, starting method (VFD, soft starter, across-the-line), starting kVA code letter, and duty cycle timing sequences
Select the type of manufacturing facility retrofit being performed to apply appropriate NEC articles and emergency system requirements
Specify maximum allowable voltage drop percentages during motor starting for different load types per ANSI/NEMA MG-1 and IEEE 241 standards
Select primary stakeholders and their review requirements for generator sizing approval and code compliance documentation
Define emergency load prioritization schedule including load shedding hierarchy and elevator motor starting delays during generator startup
Select applicable electrical standards and local amendments affecting load flow calculations and equipment selection criteria
Specify format for single-line diagram annotations, calculation reports, and technical documentation for engineering design deliverables
Enter fabrication lead times, commissioning schedule constraints, and coordinated elevator testing windows with facility shutdown requirements