Draft a mat foundation analysis report and corresponding CAD drawings that integrate geotechnical CPT data and wind tunnel pressure coefficients for a mixed-use high-rise adjacent to an existing subway tunnel

Generate draft a mat foundation analysis report and corresponding cad drawings that integrate geotechnical cpt data and wind tunnel pressure coefficients for a mixed-use high-rise adjacent to an existing subway tunnel for Architectural, Engineering, and Related Services industry

Architectural, Engineering, and Related Services

Agent Configuration

Login required: You need to sign in to execute this agent.

Click to upload or drag and drop

Allowed: CPT, ASC, XLSX, PDF

Max size: 50MB

Upload Cone Penetration Test (CPT) raw data files and interpreted geotechnical reports for the site. Include any lab testing results.

Click to upload or drag and drop

Allowed: XLSX, CSV, PDF

Max size: 40MB

Upload wind tunnel test results with pressure coefficients, wind loads, and any CFD analysis reports for the building envelope and podium.
Select the applicable building codes and performance criteria for this mixed-use high-rise
Specify the existing subway tunnel specifications, minimum clear distances, and operational constraints affecting foundation design
Choose the mat foundation type and complexity level based on building program and site constraints
Define special construction phasing, excavation support, and subway protection measures required
Specify the depth and format requirements for the foundation analysis report
Indicate the required CAD drawing package complexity and BIM level for construction documents
Select the required peer review and QA/QC verification level for this critical infrastructure interface
Provide any specific owner requirements, city agency concerns, or special coordination needs for the subway system