Draft a plumbing fixture schedule for LEED Platinum elementary school detailing rainwater-harvesting flush fixtures and touch-free sensor faucets aligned with Division 22 4000 specifications

Generate draft a plumbing fixture schedule for leed platinum elementary school detailing rainwater-harvesting flush fixtures and touch-free sensor faucets aligned with division 22 4000 specifications for Architectural, Engineering, and Related Services industry

Architectural, Engineering, and Related Services

Agent Configuration

Login required: You need to sign in to execute this agent.

Click to upload or drag and drop

Allowed: DWG, PDF, RVT, SKP

Max size: 50MB

Upload architectural floor plans and restroom elevation drawings to establish spatial constraints and fixture counts
Select the specific LEED v4.1 BD+C points strategy driving fixture selection and water-use calculations
Specify elementary school population characteristics that impact fixture ratios and accessibility requirements
Provide detailed collection area, storage capacity, filtration level, and end-use distribution parameters per Division 22 1300
Identify jurisdiction-specific amendments to IPC/UPC that govern flush volumes, fixture counts, and sensor requirements
List existing conventional fixture specifications being replaced (manufacturer/model/flush volume) for percentage reduction calculations
Specify the EPAct 1992 baseline reduction target and applicable efficiency thresholds

Click to upload or drag and drop

Allowed: XLSX, RVT, CSV

Max size: 5MB

Upload existing fixture schedule or Revit family parameters to maintain consistency with project deliverables
Provide project-specific coordination notes: lead time considerations, MEP clash constraints, utility connection phasing requirements
Select the MasterFormat/UniFormat-compliant heading structure for the fixture schedule output