Generate a Gantt-based project schedule for coordinating MEP rough-in sequences with steel-frame erection milestones in a high-rise design-build contract

Generate generate a gantt-based project schedule for coordinating mep rough-in sequences with steel-frame erection milestones in a high-rise design-build contract for Architectural, Engineering, and Related Services industry

Architectural, Engineering, and Related Services

Agent Configuration

Login required: You need to sign in to execute this agent.

Click to upload or drag and drop

Allowed: PDF, DWG, RVT, PLN, IFC, XLSX, DOCX

Max size: 100MB

Upload all relevant design-build contract documents including specifications, drawings, BIM models, and change orders
Define which MEP disciplines and systems require scheduling coordination
Input key structural steel erection milestones with tower levels and target dates
Specify the building classification for proper MEP rough-in sequence requirements
Indicate jurisdiction-specific regulations affecting MEP installation sequences
List weather-dependent limitations affecting steel erection and MEP installation sequences
Determine coordination meetings required for MEP/steel interface validation
Specify critical tolerance requirements for MEP rough-in relative to steel structure
Select buffer time allocation for design changes, RFIs, or field conditions
Define inspection and testing protocols for MEP rough-in integration
Document critical crane time allocations and lift priorities between steel and MEP trades