Upload the steel shop drawings package for structural package E-204 that contain discrepancies requiring professional submittal review
Classify the severity of discovered discrepancies against contract documents and approved shop drawings
Identify the project phase and specific activity when discrepancies were identified during erection
Select which engineering disciplines must coordinate response to ensure comprehensive technical review
Specify exact contract drawing numbers, specification sections, and detail references that establish the baseline requirements
Identify the primary building code, design standards, and special regulations governing this structural review
Record the specific measured dimensions, tolerances, and reference points that deviate from approved drawings
Determine the escalation level and communication protocol based on potential project impact
Specify the formal documentation format required for closing the submittal review process
Analyze and describe potential impacts to critical path activities, sequencing disruptions, and proposed mitigation strategies